List of Projects Involving Stress Measurements Performed and Evaluated Under the Supervision of Dr. K.Y. Lo
Interpretation of results of stress measurements for Don River Tunnel Systems (2015)
Interpretation of results of stress measurements for Billy Bishop Tunnel (Toronto Island Airport) (2013)
Interpretation of results of stress measurements in Granitic rock in Underground Research Laboratory, AECL in Deep Geological Depository of Nuclear Waste (1990-1995).
Interpretation of results of stress measurements in Queenston Formation for SABNGS No. 3 project (1992-1996).
Stress measurements in concrete in Saunders Dam for performance control after slot cutting (1995) as a mitigation measure for concrete expansion problems.
Stress measurements in concrete and rock for investigation of concrete expansion due to AAR and debonding at dam foundation interface, Saunders Dam (1987).
Stress measurements in the concrete lining of the existing Detroit-Windsor Tunnel (1987).
Stress measurements for the design of rock excavation for Scotia Plaza, Toronto (1984).
Three series of stress measurements for the design of the intake and discharge tunnels for the Darlington Nuclear Generating Station, and verification of design assumptions on stresses during construction (1980, 1981, 1982).
Stress measurements at Heart Lake Tunnel in Georgian Bay Shale, Toronto (1977).
Stress measurements in the rock cliffs overhang above Ontario Power Generating Station (1976).
Three programs of stress measurements in Limestones of the Trenton Formation at Wesleyville underground caverns (1975, 1978, 1979).
Stress measurements in Collingwood Shale at Duffin Creek Tunnel, near Toronto (1975).
Stress measurements in Georgian Bay Shale at Lakeview Tunnel (1975).
Stress measurements in Lockport Limestones and Dolomites at Thorold Tunnel, Ontario (1974).